Manhattan High End Residential Construction
by Colleen Barry-Sleicher
Manhattan High End Residential Construction Information for
brownstone, apartment, condominium and coop owners and Building
coop boards planning renovations in New York City's exclusive
cooperative and condominium buildings and Brownstones
BUILDING HISTORY
Brownstones have been a part of New York City since the 1800's.
NYC cooperative and coop buildings are designated as either pre
or post war buildings referencing WWII. Think of renovations in
these buildings as dealing with squared off areas, whether it is
a section of one floor or a vertical section of a building
having more than one floor in a single residence.
Pre War Buildings
In Pre War buildings walls are made of gypsum block along with
metal lath or steel studs. The floors and ceilings tend to be
very thick.
Post War Buildings
Gypsum block was used in 1960's buildings, plaster in the
1970's, and sheetrock up to the present. These buildings are
made up of plaster, cement and steel. Since theses materials are
very dense and less flexible than prewar buildings they tend to
transmit sound. Often soundproofing is needed under floors.
Difference in building materials
Many of the luxury buildings in NYC were built prior to 1960.
There have been many innovations in construction since.
Metallurgy has contributed many new products in building and
building maintenance. For example copper water pipe and
Synthetic rubber. The use of lead or lead containing products is
now prohibited. Paint may not be stripped with heat or dry
sanding. Chemical strippers can be used because the old paint
does not go into the air. Plaster walls and ceilings will
probably require a thin plaster layer (skim coat) to be applied
to make the surface smooth. This will seal any lead containing
paint layers in place. Asbestos was used in plaster, floor tile
and many other products in buildings prior to 1979. Now, a
certified removal company must perform any asbestos removal.
RENOVATION PROJECTS
Property owners will be required to put in time during the
planning stage. It is important to research and feel comfortable
with the designer. You must be on the same page or you will
never get the look you want. When selecting a designer, keep in
mind a project can grow beyond the skill level of the designer.
Interview several designers. Prior experience and knowledge will
determine their suitability for any project. Any delay in
selecting or approving layouts, drawings, work items or
materials will cause delays that will cause more delays. One
missing detail or purchase item may delay huge blocks of work.
Architects and Designers
Interior designers are trained in architectural design as well
as soft goods selection. Often a design firm has Architectural
designers working for them. Architects are more involved in the
methods of construction. Aspects of the project such as
electrical device location and type, air conditioning, plumbing
fixtures, walls and ceilings, architectural woodwork are of more
interest to the architect. The importance of good planning with
the architect and designer influences the project progress. For
example, the bathroom fixtures may have an impact on how the
tile work is installed. Doorway dimensions will determine the
light switch location.
Contractors
All contractors performing work on a private NYC residence must
be licensed by the NYC Department of Consumer Affairs (DCA) as a
Home Improvement Contractor (HIC). Plumbers and Electricians are
licensed by the NYC Department of Buildings. Architects are
licensed by the State. Decorators and Interior designers are not
required to be licensed.
Prepare a detailed plan of what you want accomplished before
interviewing contractors. A complete project specification must
be developed for a contractor to prepare a realistic estimate of
time, materials and cost for the home improvement project. Do
not change the plan as you speak to different contractors. You
will not be getting an 'apples to apples' quotation. The
contractor with the higher price may be including an aspect of
the project you did not make clear to another contractor.
Project specifications that are incomplete are a roadmap for
disaster.
When choosing a contractor the homeowner should consider general
knowledge, existing customer projects, references and
reputation. The homeowner might consider using the services of a
contractor referral agency. The referral agency offers the
homeowner a pool of contractors who have been screened and
matched to a particular project. Selecting a contractor who is
inexpensive, inexperienced and in over his head can only lead to
disappointment.
Cost
There are two variables that determine the final cost of each
project. 'Core Work', walls, floors, ceilings and everything
that is behind these surfaces and 'Finish Work', moldings, trim,
final skim plaster coat, marble, tile, and cabinetry. Quality of
the workmanship and the level of finish will vary between
different contractors. Core Work, behind the scenes,
construction cost are often similar from contractor to
contractor. The cost of the Finish Work will be determined by
how much you are willing to spend and the skills of the
contractor performing this work. This finish work will have the
widest variance in pricing and final appearance of the
renovation. Finish materials such as stone and woodworking will
have quality price differences.
Contracts
All contracts for home improvement in NYC must include the
address and phone number of the contractor, the contractor and
salesman license numbers, estimated dates when the work will
start and be substantially complete, description types of
material, a notice that all monies received will be deposited in
the contractors account and be used for no other propose than to
provide payments as stated in the contract, a schedule of
progress payments showing the amount or each payment and the
application of that payment in some relationship to the progress
of project completion or materials to be purchased, all
limitations, representations and warranty, a statement and
insurance certificate .
Project
Contractors will give a schedule of the work to be performed.
Building guidelines can have a great affect on the project
timeline. Over the course of the job many man-hours are lost
just getting in and out of a building. Building Hours are often
9AM-4:00 or 4:30. Building may have restrictions on the amount
of time any job can last. There may be restrictions on the
service elevator usage or water shut off times and planning.
Buildings are careful concerning site protection. Good
contractors take extra steps to protect the building and the
clients living space. Site Protection includes protecting
existing floors and dust control with exhaust fans for example. .
Projects are divided into two phases. The first phase includes
the behind the scenes construction including the walls, floors,
ceilings and everything that is behind these surfaces. The
second phase is the 'Finish Work', which is the woodworking,
cabinetry, final skim coat, marble tile and moldings. A majority
of work will be behind the scenes. The first phase is often the
most costly and time consuming. As mentioned earlier planning is
very important. Many rooms are defined by any changes including
wall locations, plumbing and water supply locations, electrical
requirements and HVAC installation.
Sample Renovation Project Tasks:
Demolition and debris removal. Many contractors
often have their own employees take care of demolition to insure
quality. Inspect for any leaks or damage
behind walls, tiled areas, floors, etc.
Repair and prep behind the scenes areas with any
needed protective installation or sealants.
Plumbing and electrical installation.
Electrical Riser Work.
Cutting through existing wall for design
changes. Framing of new walls, partitions,
etc. Complete walls
Smooth and Level floors, walls and ceilings for
cabinetry, vanities, tiling, wood floor installation etc.
Install new floor areas.
Complete ceiling changes.
Complete tiling Install
appropriate fixtures such as tub. Complete
doorway framing and interior window frames
Complete surface electrical work such as
ceilings lights, lights with cabinetry, etc.
Install cabinetry, appliances, vanities, counter
tops, etc. Complete surface flooring
Complete fixture installation
Complete crown-molding, millwork, trim work,
woodworking and carpentry. Final plaster
skim coat Floor protection and painting
Complete Painting
Faux Finish, wallpaper, murals if needed
Keep the following points in mind during a renovation:
The finish items will affect the way the rough
plumbing and electrical work will proceed Walls
cannot be closed until the inspection is performed.
Projects cannot be rushed such as painting and
come out correctly. Changes, deletions,
additions, client approval and any missing specifications or
items will cause delays in the job completion date.
Contractors do not look forward to changes and
additions, they have schedules and other projects they want to
move forward on. Job site meetings usually
produce some modifications or changes. There
will usually be some minor changes that will result in added
costs. There is always a ripple affect on any
contractor's job schedule when poor planning takes over.
Colleen Barry-Sleicher, CEO and Founder Manhattan Home